![]() ![]() IGCC approached Amarinth for the ten identical API 610 OH1 pumps as they were required on an extremely short lead time of 22-weeks Free Carriage Aboard (FCA) from the sea-port in the UK. It is managed by the Rumaila Operating Organization (ROO), a joint venture between BOC, BP, PetroChina and SOMO. The Rumaila field is estimated to contain 17 billion barrels, the largest oil field ever discovered in Iraq and considered the third largest oil field in the world. ![]() The pumps are destined for the Rumaila oil field, a super-giant oil field located 50km to the west of the city of Basra, southern Iraq. This first order for Amarinth from Iraq Gates Contracting Company (IGCC) of $410K is for ten API 610 OH1 condensate transfer pumps with Plan 11 and Plan 52 double seals and seal support systems. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |